Indicative rates for the Costa del Sol. Prices may vary depending on the site — the exact quote is calculated on site, before work starts.
Indoor and outdoor unit mounting, up to 3 m line, brackets, 1 wall hole, vacuuming and test run.
For rooms up to 35 m², up to 3 m line, reinforced brackets, technical hole drilling, vacuuming and commissioning.
Higher-power splits: reinforced brackets, larger-section line up to 3 m, vacuuming with a two-stage pump.
Semi-industrial power up to 70 m², up to 3 m line, heavy-duty anchor brackets, commissioning.
Laying K-Flex insulated copper pipe, cable and drain in the wall chase before finishing. Nitrogen pressure test.
Chasing for the refrigerant line with a wall chaser and dust-free vacuum extraction.
Diamond chase cutting in reinforced concrete for the AC line, with dust extraction.
Mounting and connecting indoor and outdoor units on finished walls, circuit vacuuming, commissioning.
Installing 1 outdoor unit and 2 indoor units in rooms with separate lines.
Full multi-zone installation with individual line routing for 3 rooms.
4-zone AC system with a single outdoor unit and circuit vacuuming.
Installation into an Armstrong or grid suspended ceiling, drain and line connection.
Commercial split installation for offices, shops and restaurants.
High output for 50–70 m² commercial spaces.
Installation of a three-phase or high-power single-phase semi-industrial unit.
Installing the unit on existing lines, with testing and vacuuming.
Concealed installation of the duct unit above a suspended ceiling, without an air-distribution network.
Low-noise concealed climate system for flats and villas.
Medium-pressure duct unit with vibration isolation and line connection.
High-pressure duct unit distributing air to several rooms.
High-power concealed climate system for large apartments and offices.
Installing a continuous-flow or reservoir pump, connected to power and drain.
Prevents bad odours from the drain from reaching the air conditioner.
Laying reinforced spiral drain hose with the correct slope.
Reliable welding of rigid polypropylene pipe for concealed condensate drainage.
Indoor unit disassembly, pressure wash in a service cover, antibacterial treatment, outdoor unit cleaning.
Full wash of the heat exchanger and fan wheel, antiseptic treatment against mould and bacteria.
Deep cleaning of higher-power units, with evaporator and drain tray disinfection.
Fixes AC leaks through mechanical and chemical drain clearing.
Eliminates bacteria, mould spores and bad odours with medical-grade products.
Charging labour + gas by electronic scale, with gauge-controlled superheat check.
Dry nitrogen test up to 30 bar, micro-leak location with an electronic leak detector.
High-temperature copper pipe brazing with silver filler under nitrogen.
Eccentric flaring with cone-face check for joint tightness.
Component-level resoldering: IPM power modules, filter capacitors, processors, at the workshop.
Replacing a failed compressor or outdoor fan capacitor.
Replacing the compressor or indoor unit thermistor, with resistance calibration.
Solenoid diagnostics and resoldering of the winter/summer reversing valve.
Pumping refrigerant into the outdoor unit and carefully removing both units.
€0 if you go ahead with the repair! Gas pressure, electrics, control boards and compressor check.
Full check of circuit balancing and the outdoor unit's electronic expansion valves.
Hole up to 160 mm / 50 cm deep, fitting and sealing. Valve and kit not included.
Hole up to 200 mm / 50 cm deep, setup and configuration. Unit and power line not included.
Two holes, two units, synchronisation and testing.
Cassette cleaning per instructions, mode check. Filters and repairs not included.
Fixing, connection, test. No new hole or wiring.
Fixing and local connections to pre-prepared services. Unit, network and full commissioning not included.
Fixing, anti-vibration mounts, local connections. Duct network and commissioning not included.
Mounting the unit at prepared points. Rigging, network and commissioning not included.
Mounting the unit at prepared points. Rigging, network and commissioning not included.
Fixing and local connection. Fan, duct section and power not included.
Fixing and local connection. Fan, network and power not included.
Mounting on a ready-made roof curb with local connection. Curb, roof works and lifting not included.
Dismantling and stacking on site. Haulage, disposal and finishing not included. Minimum €200.
Disconnecting services and removing the unit. Special equipment and haulage not included.
Setup, automation and airflow checks, report. Requires an already-installed working network.
Filter, accessible parts, drive, electrics, modes. Filters, repairs and deep washing not included.
Two fans, filters, heat recovery core, protections and modes. Filters, belts, washing and repairs not included.
Accessible components, adjustment and protection checks. Scope depends on datasheet and dirt level.
Removing, fitting and securing the replacement. Filter not included.
Cleaning the accessible removable cassette per instructions. Complex unit disassembly not included.
Replacement and tension adjustment. Belt not included; pulleys should be checked first.
Replacing the accessible compatible motor and testing. Motor, rigging and balancing not included.
One accessible section, dust containment, cleaning. Disinfection, grease and access hatches not included. Minimum €300.
Accessible duct, protective measures and washing. Chemicals, hatches and height access not included. Minimum €350.
Cleaning the accessible hood, collecting debris. Duct, fan and heavy grease not included.
Removing accessible dirt and checking rotation. Complex disassembly not included.
Replacing one accessible component, flow test. Part and new pipework not included.
Fitting a compatible sensor and checking readings. Sensor and extra disassembly not included.
Fitting a compatible motor and function test. Motor, lifting and complex access not included.
Replacement of the agreed compressor. Compressor, filter and refrigerant not included.
Replacing the agreed component per fault assessment. Part and circuit restoration quoted separately.
Compatible module, client's app, command testing. Module and subscriptions not included.
One device, basic commands, on-site testing. Gateway not included.
Backup, access list, guide, session up to 2 h.
* Prices are indicative and may change — use them as a budget reference. The exact cost is set on site, before work starts, and confirmed in the quote.